The Summer ’26 countdown is historical. Its release and event dates should not be reused in a current plan. This page now turns that roundup into a way to handle three different types of admin information without conflating them.
Separate the three workstreams
- Release: map a feature to the org and test it against active automation and users.
- Event: verify current dates, registration, and recordings with the event organizer.
- Security: track the exact policy, affected login flow, enforcement date, and migration owner.
Assign each item one status: action required, test required, informational, or expired. Recheck security dates against the current Help article, because Salesforce can change enforcement schedules. For example, the OAuth username-password flow deadline is now February 20, 2027, not the originally announced Winter ’27 timing.
Use the current release notes, security notice, and official event pages. This article is a planning method, not a live Summer ’26 or Dreamforce deadline calendar.